Waste water Treatment Plant(WWTP) design
- Seunghye Baek

- Mar 15, 2020
- 1 min read
Period: 2017.03~2017.07
Goal of this project: Choose one in various wastewater treatment process types and
developing it for treating wastewater of school building. Also, find a way to reuse treated water.
Selected buildings: Engineering building-1, Engineering building-2 (University of Seoul)
1. Basic information
Total building surface area: 20,604.2 m2
Number of people who use this building: 776


2. Consideration lists of WWTP Site selection
-no pressure flow
-Minimum pipe line extension
-no flood risk
-enough surface area for eco-design
-easily accessible to recycled water
->selected site: Basement of Engineering building-1
3. Wastewater treat process


1.1. Pretreatment of toilet waste water(lower concentration) and Lab wastewater(remove chemicals).
1.2. Main process

1.3. Efficiency